info@awind-cn.com    +86-769-89386135
Cont

Have any Questions?

+86-769-89386135

Friction Stir Welding Liquid Cold Aluminum Plate Copper Water Cooling Block

Friction Stir Welding Liquid Cold Aluminum Plate Copper Water Cooling Block

In this experiment, we will use copper tube water cooling plate to conduct a thermal simulation of 1200w led. Through the temperature graph, pressure graph, Velocity Vector, etc, you can better see the effect of the water cooling plate in terms of heat dissipation. The experiment will provide two solution.
Send Inquiry

Product Introduction

We actively participate in regional economic development and strive to optimize the Cooling Plate Heat Sinks, Cold Forging Heat Sink for LED, Zippered Fin Heat Sinks industrial structure. We encourage mutual support and achievement between companies and employees, and between employees and staff, to create a good atmosphere for mutual growth and development. Over the years, our company has benefited from the country's sustained economic growth and has become an industry leader thanks to our own professionalism and dedication. Over the past few years, tens of thousands of new and old customers have established cooperative relations with our company, and they have given a very high evaluation of our products and after-sales services.


Thermal Simulation of Water Cooling Plate with Copper Pipe

In this experiment, we will use water cooling plate with copper pipe to conduct a thermal simulation of 1200w led. 

Through the temperature graph, pressure graph, Velocity Vector, etc, you can better see the effect of the water cooling plate with copper pipe in terms of heat dissipation. The experiment will provide two solution.



Design Input

Cooling method: Forced water cooling

Coolant: Pure water

Ambient temp. Ta: 40℃

LED watt loss: 1114W

Max temp: 50-60℃


1


Design parameter

1. Ambient temp. Ta [°C]: 40C

2. Cabinet temp. Tw [°C]: Unit will be on the top (outside) the cabinet only the glass side will be in the cabinet

3. Cabinet dimension: Unit will be outside the cabinet

4. Power dissipated P[W]: Total Electrical installed power 1500Watt but dissipated around 1200Watt

5. Heat source quantity: Check attached pictures

6. Heat source position and dimension: Check Attached pictures

7. Location of in/outlet water (better to provide system 3D file): Check Attached pictures

8. Accept Max Temp on cold plate [°C]: 50 till 60

9. Installation Hole dimension and position of cold plate: Check the pictures, I have now only 4 holes drawed for assembly the unit the unit till the cabinet. I need a lot of holes for assembly the LED PCB's and Channel Driver and PSU. I want to place alu baseplates to drill all the holes to mount the baseplates I need only a view holes with thread.

10. Liquild Flow rate: _____L/min Depends on what the thermal analysis will tell us what the flow rate must be.

11. Liquid cooling plate Max.size: See Pictures size will be 680x600 but the actual colling area will be 600x540

12. Liquid type: Pure water

13. Temperature of inlet water: Depends on the result of the thermal analysis

14. Temperature of outlet water: Depends on the result of the thermal analysis.

15. Allow Max. pressure of cold plate: Depends on the result of the thermal analysis.


3

4

The model of coolant




5




Solution 1: Velocity of Inlet=0.5m/s(2.7L/min)


6

Temperature of Cool Plate



7

Pressure Drop:5842.6Pa



8

Temperature of Coolant



9(001)

Velocity Vector



Solution 2: Velocity of Inlet=0.3m/s(1.62L/min)


10

Temperature of Cool Plate



11

Pressure Drop:2898.7Pa



12

Temperature of Coolant



13(001)

Velocity Vector


Conclusion

Flow(L/min)

Tmax (0C)

DeltaT (0C)

Delta P (Pa)

Resistance( 0C/W)

2.7L/min

46.817

6.817

5842.6

0.00612

1.62L/min

50.838

10.838

2898.7

0.00973


With this design( Al Cool Plate ), the simulation result of solution meet the Spec.


While increasing our global market influence, we will continue to focus on the quality of our Friction Stir Welding Liquid Cold Aluminum Plate Copper Water Cooling Block and services and maintain our good reputation as a customer-centric company. Sustainable development challenges such as climate change, material use, energy demand, water resource utilization, and health and safety have spawned new customer needs and legislative considerations. We always adhere to the guiding ideology that science and technology is the first productive force in our development, and take scientific and technological innovation as a major event in our enterprise development.

Hot Tags: Thermal Simulation of Water Cooling Plate with Copper Pipe, China, suppliers, manufacturers, factory, customized, free sample, made in China, High Quality Heat Sink, Vacuum Brazing Liquid Cold Plate, Anodized Heatsink, OEM Folded Fin Heat Sinks, Vapor Chamber, Friction Stir Welding Liquid Cold Plate

[[ProKeywords]]

Send Inquiry